top of page
kage-logo-blue.png

Priority Resurfacing Phase 8 Design

Nassau County
PROJECT DESCRIPTION

This project involves the rehabilitation of approximately 50 lane miles along twenty- two [22] roadways county-wide to extend their service life and provide the appropriate pavement ride quality. The design work included the preparation of a detailed Technical Design Report [TDR], ADA Report, and Detailed Design Services and Construction Documents. The design team evaluated all existing curbs, curb ramps and driveway aprons within the project limits, proposed repairs/replacement of deteriorated cross-sections and addressed all necessary drainage issues. Pavement marking design was also provided.

Copyright © 2011-2024 KAG Engineering, PLLC.   

All Rights Reserved

kage-logo-circle-white.png
bottom of page